Major Projects

Some great things we've done
q1

Building
Q1

SPL is very proud to be associated with the installation of the Q1’s locking hardware and restricted keying system, considering that the building at the time was the tallest residential tower in the world.

Circle-on-cavill

Building
Circle On Cavill

Circle on Cavill was SPL’s biggest project they had ever undertaken. SPL was responsible for installing the restricted keying system, architectural door hardware and bathroom accessories, while SPL’s Electronic division covered off on all the CCTV, access control, intercom system for both towers and MATV.

the-oracle-on-broadbeach

Building
The Oracle on Broadbeach

SPL were responsible for the restricted keying system on both towers as well as the Architectural door hardware.

Call: 07 55 888 111